Brand new railings for Gwaing promenade
The promenade at Gwaing Beach boasts with brand new stainless steel railings, installed yesterday (23 June) to replace the existing wooden railings. The railings installed at a cost of R90 000, have been crafted out of stainless steel for durability and still have to be polished up with a burnishing compound. The crossbar design allows for stronger sections to accommodate potential rough seas, as well as allowing for easier repair or replacement. The wooden railings will be removed. Budget used in this project is drawn from the 2020/21 Financial year.