Skip to content Skip to left sidebar Skip to right sidebar Skip to footer

ESKOM LOADSHEDDING UPDATE, Sunday, 19 November 2023

In order to replenish emergency reserves in preparation for the week ahead, Stage 3 loadshedding will be implemented from 09:00 this morning until 05:00 on Monday. Eskom will communicate the outlook for the week ahead this afternoon.

*George will be affected as follows:*
Sunday 19/11/2023
14:00 – 16:30
22:00 – 00:30

Monday 20/11/2023|
06:00 – 08:30.

*Uniondale will be affected as follows:*
Sunday 19/11/2023
17:00 – 19:30

Monday 20/11/2023
01:00 – 03:30
09:00 – 11:30

ROTATIONAL SWITCH ON AFTER LOADSHEDDING – reduce power to avoid network tripping
Consumers are reminded to PLEASE use electricity sparingly after power returns. Please do not switch high-usage equipment on immediately after Load shedding.

Consumers are urged to turn off high-usage equipment and where possible to not switch on appliances such as stoves and kettles for at least 30 minutes after load shedding is scheduled to return. This will reduce the risk of overload tripping on the network.

Reporting power outages
Please do not phone the after-hours number or the Electrotechnical Department to report that you have no power immediately after load shedding is scheduled to be lifted. Please be aware of the rotational switching on i.e. areas are switched on one by one and not all at the same time to avoid overloading the system. Please wait at least 30 minutes before reporting no power. The Electrotechnical Directorate will be aware of a possible substation trip that needs to be sorted out.

Receive Eskom loadshedding notifications by downloading the free EskomSePush app from Google Play Store at https://sepush.co.za/

Issued on behalf of ESKOM by George Municipality