Skip to content Skip to left sidebar Skip to right sidebar Skip to footer

Notice Archive

Planned power outage: portion of Pacaltsdorp

NOTIFICATION OF THE INTERRUPTION OF THE ELECTRICITY SUPPLY.

THE FOLLOWING AREAS WILL BE AFFECTED:

PORTION OF PACALTSDORP

BROMVOËL CLOSE,

MISSION & FERN STREETS

NOTICE is hereby given that the electricity supply will be interrupted on  MONDAY 15 JULY  2024  FROM  09H00 TO 16H00 for the purpose of doing alterations to the electrical mains. Consumers are warned to treat the installation as being live for the full duration as the supply may be resumed at any time within the notified period.

Should circumstances prevent the work being carried out during the abovementioned period; the work will be done on TUESDAY 16 JULY  2024 FROM  09H00 TO 16H00.

KENNISGEWING VAN  DIE ONDERBREKING VAN DIE ELEKTRIESE TOEVOER.

DIE VOLGENDE AREAS SAL GERAAK WORD:

GEDEELTE VAN PACALTSDORP

BROMVOËL CLOSE,

MISSION & FERNSTRATE

KENNISGEWING geskied hiermee dat die elektriese toevoer onderbreek sal word op MAANDAG 15 JULIE 2024 VANAF  09H00 TOT 16H00 met  die doel om veranderings aan elektriese hoofleidings te maak. Klante word gewaarsku om die installasie as lewendig te beskou vir die volle periode aangesien die toevoer enige tyd gedurende die periode aangeskakel mag word.

Sou omstandighede verhoed dat die werk gedoen kan word gedurende bogenoemde periode, sal die werk gedoen word op DINSDAG 16 JULIE 2024 VANAF 09H00 TOT 16H00.

GARDEN ROUTE DAM LEVEL

Percentage storage at new raised dam wall height 96,72%
Rainfall for the previous days: 17 mm (Measured rainfall figures from 2-8 July 2024)

For water-saving tips please visit: http://tinyurl.com/3439h4n7
The cooperation of all users of municipal water is essential and is greatly appreciated.

Permanent Closure of Victoria Street Entry Gate to George Municipality Main Building

Municipal Gate at the Victoria Street entrance

Permanent Closure of Victoria Street Entry Gate to George Municipality Main Building

The public is hereby informed that, following continued concerns regarding reckless driving by motorists accessing the Municipal Gate at the Victoria Street entrance and to ensure the safety of pedestrians and employees, a decision has been made to permanently close the Victoria Street entrance to the George Municipality Main Building.

The Victoria Street entry gate to the George Municipality Main Building will be permanently closed, effective 1 August 2024

This action has been taken to address the issue of reckless driving in the parking area.

**
Permanente sluiting van Victoriastraat-toegangshek na George-munisipaliteit se hoofgebou

Die publiek word hiermee ingelig dat, na aanleiding van voortgesette kommer oor roekelose bestuur deur motoriste wat toegang tot die Munisipale Hek by die Victoriastraat-ingang verkry en om die veiligheid van voetgangers en werknemers te verseker, ‘n besluit geneem is om die Victoriastraat-ingang na die George Munisipaliteit permanent te sluit. Hoofgebou.

Die Victoriastraat-toegangshek na die George-munisipaliteit se hoofgebou sal permanent gesluit wees, effektief 1 Augustus 2024

Hierdie aksie is geneem om die kwessie van roekelose bestuur in die parkeerarea aan te spreek.

*
Ukuvalwa ngokusisiGxina kweSango lokuNgena eVictoria Street kwiSakhiwo esiKhulu sikaMasipala waseGeorge

UluNtu luyaziswa ukuba, kulandela inkxalabo eqhubekayo malunga nokuqhuba ngokungakhathali kwabaqhubi abangena kwiSango likaMasipala kwisango eliseVictoria Street nokuqinisekisa ukhuseleko lwabahambi ngeenyawo nabasebenzi isigqibo sithathiwe sokuvala ngokusisigxina isango laseVictoria Street eliya kwiSakhiwo esiKhulu sikaMasipala waseGeorge.

Isango lokungena laseVictoria eliya kwiSakhiwo esiKhulu sikaMasipala waseGeorge liya kuvalwa ngokusisigxina, ukususela ngomhla woku-1 kweyeThupha 2024

Eli nyathelo lithatyathwe ukuze kukhawulelwane nomba wokuqhuba ngokungenankathalo kwindawo yokumisa iimoto.

The StartUp Tribe- Entrepreneurship Academy online platform

Gain access to the world of Business with George Municipality and the Start-Up Academy Online Platform
You will have the opportunity to learn from other existing entrepreneurs who have paved the way in their respective industries.

The courses are short and you can access them from anywhere at your own pace.

Register below
https://www.thestartuptribe.org/users/sign_up

#Startuptribeishere
#Supportingsmallbusiness
#Supportlocalentrepreneurs

Update 4: Burst Water Pipeline Affecting Multiple Areas in George

Issued by George Municipality, 6 July @ 20:20

The pipe repair will be complete by 21:00.

Tankers will be withdrawn from Thembalethu at 21:00.

Residents are to note that the water will not be fully restored at 21:00 as Thembalethu network, Tower and Reservoir are empty. The network, Tower and Reservoir will fill through the night.

As the network fills, pressure will be restored to low-pressure areas.

Residents are urged to use water sparingly to allow the network and reservoirs to fill.

Residents experiencing water outages should contact the After Hours Call Centre on 044 801 6300.

George Municipality thanks residents for their understanding and patience while the water is restored

***

Update 3: Burst Water Pipeline Affecting Multiple Areas in George
Issued by George Municipality, 06 July 2024 @17:40

• A tanker will be stationed at the corner of Tabata and 29th Street in 50 minutes. https://maps.app.goo.gl/JhZ1cCKg3mcZCFVZA
• A large water tanker will be stationed at Fourways at the Fire Station in Thembalethu
• The repair should be complete by 21.00.

Residents experiencing water outages should contact the After Hours Call Centre on 044 801 6300.

Thank you for your cooperation and understanding.

***

UPDATE 2: Burst Water Pipeline Affecting Multiple Areas in George
Issued by George Municipality, 6 July 2024 @16:40

A pipe burst has negatively impacted reservoirs supplying George with water. Municipal teams and a Municipal Contractor are working to repair the pipeline. The repair should be complete by 21.00.

Residents of Kraaibosch, Blue Mountain, Levallia, Rosemore, Parkdene, and Conville are expected to have water, at low pressure.

George municipality is aware that residents of Thembalethu have no water. A large water tanker will be stationed at Fourways at the Fire Station

The tanker will stand here for Zone 6 in 30 minutes https://maps.app.goo.gl/D2pe4WmFgvU1QdhR8

The tanker will stand here for Zone 9 in 30 minutes. By Thembalethu High School https://maps.app.goo.gl/MSzuCntw84YeRMaU9

Residents who are experiencing water outages should contact the After Hours Call Centre on 044 801 6300.

Thank you for your cooperation and understanding.

***

Issued by George Municipality, 6 July 2024@10:45

The pipe has been confirmed as an 800mm bulk water pipeline which supplies Kraaibosch, Blue Mountain, Levallia, Rosemore, Parkdene, Conville and Thembalethu. The burst has negatively impacted the reservoirs supplying George with water. Municipal teams and a Municipal Contractor are working to repair the pipeline. The estimated repair time is 6-8 hours. This may be extended should the material to repair the pipe be unavailable.

Residents of Kraaibosch, Blue Mountain, Levallia, Rosemore, Parkdene, and Conville are expected to have water, at low pressure.

Residents of Thembalethu, especially Zone 9, may experience no water. A large water tanker will be stationed at Fourways at the Fire Station, with a smaller tanker roaming the streets.

ALL residents are urged to use water very sparingly due to low reservoir levels.

Residents who are without water should contact the After Hours Call Centre on 044 801 6300.

Thank you for your cooperation and understanding.

***

Issued by George Municipality, 5 July 2024@08:00

A 600mm bulk water pipeline supplying Kraaibosch, Blue Mountain, Levallia, Rosemore, Parkdene, Conville and Thembalethu has burst and negatively impacted the reservoirs feeding George. Municipal teams are working to repair the pipeline. Repair time will be confirmed as more information is available.

All residents are expected to have water. Residents are urged to use water very sparingly due to low reservoir levels.

Residents who are without water or experiencing low pressure should contact the After Hours Call Centre on 044 801 6300.

Thank you for your cooperation and understanding.

A city that Works, Thrives, and Grows!

The George Municipality has introduced several ways that allow the public to view new vacancies. We invite talented, hardworking, and skilled individuals to join our institution and help serve our city.

To apply for a position at the George Municipality, please access our latest vacancies in the following three ways:

The Smart City App
Find Vacancies by clicking on the Vacancies Icon
www.mysmart.city

Join the Garden Route Municipalities’ WhatsApp Group for regular vacancy updates!
https://whatsapp.com/channel/0029Va92oJoJpe8eiTvq3q33

George Municipal Website
https://www.george.gov.za/hr-doc-categories/jobs-and-bursaries/current-job-opportunities/

How to Apply
https://www.george.gov.za/human-resources/

#WorkinGeorge
#LocalGovernmentopportunities
#Vacancies

Western Cape Disaster Management Centre prepares for a series of cold fronts hitting the province from Sunday until Friday next week

Western Cape Disaster Management Centre prepares for a series of cold fronts hitting the province from Sunday until Friday next week.
05 July 2024

The Western Cape can expect a series of cold fronts with adverse weather conditions starting this weekend and continuing into most of next week, Anton Bredell, Western Cape Minister for Local Government, Environmental Affairs and Development Planning said today. The Provincial Disaster Management Centre (PDMC) was briefed this morning by the South African Weather Services (SAWS) on the approaching weather systems.

The following weather warnings have been issued by SAWS:
• A Level 4 for heavy rain and potential flooding over the western parts of the Western Cape on Sunday.
• A Level 6 warning for high winds of between 80 and 90km/h over the western and south-western parts of the Western Cape on Sunday.
• A level 4 warning for winds of between 50 and 70km/h for the Namakwa district as well as the central and eastern parts of the Western Cape.
• A Level 6 warning for waves between 6 and 8 metres along the coastline between Alexander Bay and Cape Agulhas from Sunday, spreading to Plettenberg Bay by the afternoon.
• A Level 4 warning for disruptive snowfall over the mountains of the Western Cape as well as southern high ground of the Namakwa District on Sunday.

Minister Bredell said the PDMC is on standby, and the various municipal district disaster centres are ready to be activated if needed. Emergency, rescue and social services are prepared to respond to any eventualities. Provincial departments are represented at the PDMC and will be ready to provide support if needed.

The Department of Water and Sanitation said catchments and dam levels are being monitored closely and regular updates will be made to the PDMC as the weather systems develop.
Residents are urged to stay warm and safe. “With the end of the school holidays many people may be travelling home. We ask residents to please be extremely cautious on the roads. Due to the combination of high winds, heavy rain, and snow falls over high mountains expected, we urge residents to please reconsider travel and outdoor activities next week and avoid unnecessary travel. Strong winds, combined with rain saturated soil increases the risks for trees and tall structures being toppled,” Minister Bredell cautioned.

Various government services may be affected by the inclement weather and residents are asked to please stay informed by monitoring the latest weather reports through trusted local news platforms, radio alerts, and your local municipality’s social media pages. Services are also being activated to support the vulnerable and those impacted by the inclement weather,” the Minister concluded.

ENDS

Contact:
Wouter Kriel
Spokesperson for Minister Anton Bredell
Western Cape Minister of Local Government, Environmental Affairs and Development Planning

UPDATE: Power Outage in parts of Wilderness


Issued by George Municipality, 05 July 12:15

A large part of Wilderness experienced voltage issues due to a faulty Eskom breaker. This issue has now been resolved and the power supply has been restored to most parts of Wilderness.

However, we still have parts of Erica and Silverbos Roads blocked off due to vegetation.

Our team is currently working to address this issue.