Skip to content Skip to left sidebar Skip to right sidebar Skip to footer

Updated Public Notice: Resurfacing of CJ Langenhoven Road, George

ROAD CONSTRUCTION IN GEORGE

Resurfacing of CJ Langenhoven Road, George will impact on road users from July to September 2022.

DESCRIPTION: Resurfacing of CJ Langenhoven Road

 

PLANNED CONSTRUCTION ACTIVITIES ON CJ LANGENHOVEN ROAD:

The works comprise resurfacing of CJ Langenhoven Road, George. The section in question is between the George  Hospital in the west and York Street in the east.

Also included are some stormwater repairs and the repair of kerbs.

The length of the above road section is approximately 1030 meters.

There is one lane in each direction along this section of the road, with numerous accesses to commercial

properties. The width of the road is approximately 11.4 meters.

PROJECT PERIOD:

July to September 2022.

 

SERVICE DISRUPTION:

Traffic congestion can be expected.

 

TRAFFIC IMPACT:

The remedial work will require the milling and removal of existing bituminous layers as well as milling and removal

of existing gravel base layers. After the milling operations, will follow placing of new bituminous base layers and

surface layers.

 

The above work will be carried out in half width road construction which can lead to traffic congestion and delays.

CJ Langenhoven Road will be closed to traffic heading towards Blanco, but accessible towards York Street.

Reconstruction and repairs to kerbs will have no major traffic impact.

 

DRIVING COMFORT:

There will be height differences between the two lanes while milling and asphalt construction work is in progress.

Drivers, cyclists, and pedestrians must exercise extreme caution, especially during wet conditions and when

visibility is poor and at night. Vehicles with low profile tyres and motorcyclists must take extra care.

 

PROJECT ENQUIRIES: iX Engineers – 084 653 2220

 

 

 

The George Municipality apologises for the inconvenience and appeals to road users to be patient and exercise caution during the project.

Please look out for and adhere to temporary road signage and roadworks personnel.