Planned power outage: portion of George Central – Market Street

Planned Power outage for Market Street 14 Aug 2022 is postponed to alternative date 21 Aug 2022 due to rain prediction.
NOTIFICATION OF THE INTERRUPTION OF THE ELECTRICITY SUPPLY.
 
THE FOLLOWING AREAS WILL BE AFFECTED:
PORTION OF GEORGE CENTRAL
MARKET STREET
 
NOTICE is hereby given that the electricity supply will be interrupted on SUNDAY 14 AUGUST 2022 FROM 08H30 TO 16H00 for the purpose of doing alterations to the electrical mains. Consumers are warned to treat the installation as being live for the full duration as the supply may be resumed at any time within the notified period.
 
Should circumstances prevent the work being carried out during the abovementioned period; the work will be done on
SUNDAY 21 AUGUST 2022 FROM 08H30 TO 16H00.
 
KENNISGEWING VAN DIE ONDERBREKING
VAN DIE ELEKTRIESE TOEVOER.
 
DIE VOLGENDE AREAS SAL GERAAK WORD:
GEDEELTE VAN GEORGE CENTRAL
MARK STRAAT
 
KENNISGEWING geskied hiermee dat die elektriese toevoer onderbreek sal word op SONDAG 14 AUGUSTUS 2022 VANAF 08H30 TOT 16H00 met die doel om veranderings aan elektriese hoofleidings te maak. Klante word gewaarsku om die installasie as lewendig te beskou vir die volle periode aangesien die toevoer enige tyd gedurende die periode aangeskakel mag word.
 
 
Sou omstandighede verhoed dat die werk gedoen kan word gedurende bogenoemde periode, sal die werk gedoen word op SONDAG 21 AUGUSTUS 2022 VANAF 08H30 TOT 16H00.

PUBLIC NOTICE: GARDEN ROUTE DAM LEVEL UPDATE

Dam level: 89.94%
Estimated level at new dam wall height: 71.56
Rainfall since 3 August 2022: 3.6mm
Demand/usage per day: 33.3 megalitres

(Please note the dam level indication is based on the spillway and dam wall height before it was raised, the latter is the new unofficial estimation based on preliminary calculations ahead of re-calibration of the dam. Re-calibration has commenced and is dependent on several factors. Adjusted official readings will be implemented and reported once new capacity has been confirmed, the time period of this is unknown).

Section 2B water restrictions for Uniondale and George remain in place as per Council decision.
Uniondale and George water restrictions details on https://www.george.gov.za/civil-engineering/water/

Report water leaks and burst pipes to 044 801 9262/66 or after hours at 044 801 6300, as soon as you notice them.

Eskom: Possible Stage 2 loadshedding tonight

Eskom Loadshedding:Due to a shortage of generation capacity, Stage 2 loadshedding might be required at short notice during the evening at 16:00 – 24:00 tonight ( Eskom). Issued by George Mun 10 Aug 2022 at 14h00
If Eskom implements stage 2, then George will be affected as follows:
Wednesday 10/08/2022
18:00 to 20:30
If Eskom implements stage 2, then Uniondale will be affected as follows:
Wednesday 10/08/2022
21:00 to 23:30

PUBLIC NOTICE: MUNICIPALITY CLOSED ON PUBLIC HOLIDAY (WOMEN’S DAY): See refuse collection schedule

*PUBLIC NOTICE: MUNICIPALITY CLOSED ON PUBLIC HOLIDAY (WOMEN’S DAY)*
Please note that the George Municipality offices will be closed on Tuesday, 09 August 2022 for Women’s Day, a public holiday. After-hours emergencies: 044 801 6300. Fire emergencies: 044 801 6311
*REFUSE COLLECTION ON WOMEN’S DAY, 9 AUGUST 2022*
Refuse (black, green, and blue bags) will be collected as per the normal schedule on Women’s Day Tuesday, 09 August 2022.
Businesses ARE REQUESTED TO PLEASE ONLY put REFUSE BAGS OUT on Mondays, Wednesdays and Fridays AND only at designated spots, not on the sidewalk.
*REFUSE REMOVAL: GENERAL*
All refuse bags; black, green, and blue, must be put out by 07:00 am on the removal day ONLY.
Only 4 green bags are allowed, and unlimited blue bags.
All black bags will be collected on the Public Holiday (09 August 2022) and can also be substituted or combined with bundles of branches/ garden waste. Bundles must not be too big for one person to pick up OR more than 1m in length.
Broken glass should be wrapped in a newspaper when thrown into bags to prevent injuries to workers. Bulky waste must be disposed of at the Gwaiing Landfill Site on R102. The Gwaiing landfill site will be open Monday to Friday from 7:00 until 19:00, Saturdays and Public Holidays from 7:00 until 15:00 (except Christmas Day).
*CONTACT*
George Municipality Environmental Services
82 Meade Street, George. Phone 044 802 2900
Black bag-related enquiries: 044 802 2900
Blue and green bag enquiries: LGE Waste, 044 878 0688/ lgewaste@gmail.com

PUBLIC NOTICE: THE WORKER’S COLLECTION POINT IS TEMPORARILY CLOSED UNTIL FURTHER NOTICE

PUBLIC NOTICE: THE WORKER’S COLLECTION POINT IS TEMPORARILY CLOSED UNTIL FURTHER NOTICE

The Workers’ Collection Point has been temporarily closed with effect from 8 August 2022 until further notice. This point is situated at Industrial Avenue in George and was established for private individuals and businesses to make use of it as a central point for those who wish to collect workers.

For further enquiries, please contact the Economic Development department for any queries at 044 801 9477, extension 9994.

Issued by George Municipality

6 August 2022

ESKOM LOAD SHEDDING UPDATE 5-7 AUG 2022

ESKOM LOAD SHEDDING UPDATE 5-7 AUG 2022
Issued by George Municipality

Friday, 05 August 2022: Due to the continued shortage of generation capacity, Stage 2 load shedding is currently being implemented until midnight. Stage 2 load shedding will again be implemented during the evening peak period of 16:00-24:00 both on Saturday and Sunday.

George will be affected as follows:

Friday 05/08/2022
20:00 to 22:30

Saturday 06/08/2022
20:00 to 22:30

Sunday 07/08/2022
None

Uniondale will be affected as follows:

Friday 05/08/2022
16:00 to 17:30
23:00 to 00:30

Saturday 06/08/2022
23:00 to 00:30

Sunday 07/08/2022
None

GEORGE PUBLIC NOTICE: Approval of the draft IDP/PMS and Budget time-schedule

 GEORGE MUNICIPALITY

PUBLIC NOTICE: APPROVAL OF THE DRAFT IDP/PMS AND BUDGET TIME-SCHEDULE

 

On 28 July 2022, council noted the draft Time-Schedule for final approval in August 2022.

The IDP and Budget Time Schedule is compiled in accordance with Section 29 of the Municipal System Act to provide the public with the needed notice to participate in the processes.

The Time Schedule seeks to outline a process specifying the timeframes for the different planning steps and to outline appropriate mechanisms, processes and procedures for consultation and participation of local communities, organs of state and other role-players in the IDP and Budget process.

 

 

Op 28 Julie 2022 het die raad kennis geneem van die konsep tydskedule vir finale goedkeuring in Augustus 2022.

Die GOP en Begroting Tydskedule word in ooreenstemming met Artikel 29 van die Munisipale Stelselwet saamgestel om die publiek van die nodige kennisgewing te voorsien om aan die prosesse deel te neem.

Die Tydskedule poog om ‘n proses te skets wat die tydraamwerke vir die verskillende beplanningstappe te spesifiseer en om toepaslike meganismes, prosesse en prosedures vir konsultasie en deelname van plaaslike gemeenskappe, staatsorganisasies en ander rolspelers in die GOP en Begrotingsproses te skets.

 

 

 

Any comments may be directed to the Deputy Director’s office via email before 19 August 2022. Email: Kosie Haarhoff @ khaarhoff@george.gov.za or call: 044 801 9025

 

Enige kommentaar kan per e-pos aan die Adjunk direkteur se kantoor gerig word voor 19 Augustus 2022. E-pos: Kosie Haarhoff @ khaarhoff@george.gov.za of skakel: 044 801 9025

 

M GRATZ

MUNICIPAL MANAGER

UPDATE: REPAIRS ON GOING TO THE HEROLDS BAY SEWER PUMP STATION RISING MAIN

UPDATE: HEROLDS BAY SEWER PUMP PIPE TO BE REPAIRED ON FRIDAY

The Herolds Bay sewer pump station rising main failed this morning resulting in spillage in Gericke Street. The Civil Engineering Services teams immediately attended to the situation.

The rising main has been exposed. The repair work on the pipe is currently in process. The delay in exposing the pipe is due to other existing services crossing the pipework and breaking of the concrete encasement on sections of the pipeline.

Meanwhile, the public and residents in Herold’s Bay are kindly requested to use water sparingly during this time and to discharge as little water as possible into the sewer network.

The pipe will only be repaired by tomorrow (Friday, 5 August). Teams indicated that the pipe cracked further into the concrete.

Issued by George Municipality

4 August 2022

17:40