Skip to content Skip to left sidebar Skip to right sidebar Skip to footer

Notices

Planned Interruption of the Electricity Supply: Portion of George Central

PLANNED INTERRUPTION OF THE ELECTRICITY SUPPLY: PORTION OF GEORGE CENTRAL

THE FOLLOWING AREAS WILL BE AFFECTED:
PORTION OF GEORGE CENTRAL
MITCHELL AND STOCKENSTROM STREET.

NOTICE is hereby given that the electricity supply will be interrupted on TUESDAY 23 JULY 2024 FROM 09H00 TO 16H30 to do alterations to the electrical mains. Consumers are warned to treat the installation as being live for the full duration as the supply may be resumed at any time within the notified period.

Should circumstances prevent the work from being carried out during the abovementioned period; the work will be done on WEDNESDAY 24 JULY 2024 FROM 09H00 TO 16H30.

*

BEPLANDE ONDERBREKINGVAN DIE ELEKTRIESE TOEVOER: GEDEELTE VAN GEORGE SENTRAAL

DIE VOLGENDE AREAS SAL GERAAK WORD:
GEDEELTE VAN GEORGE SENTRAAL
MITCHELL EN STOCKENSTROM STRAAT

KENNISGEWING geskied hiermee dat die elektriese toevoer onderbreek sal word op DINSDAG 23 JULIE 2024 VANAF 09H00 TOT 16H30 met die doel om veranderings aan elektriese hoofleidings te maak. Klante word gewaarsku om die installasie as lewendig te beskou vir die volle periode aangesien die toevoer enige tyd gedurende die periode aangeskakel mag word.

Sou omstandighede verhoed dat die werk gedoen kan word gedurende bogenoemde periode, sal die werk gedoen word op WOENSDAG 24 JULIE 2024 VANAF 09H00 TOT 16H30.

Planned Water Interruption, Groeneweide Park

NOTIFICATION OF THE INTERRUPTION OF THE POTABLE WATER SUPPLY.

THE FOLLOWING AREAS WILL BE AFFECTED:
Groeneweide Park, Gwaing, George Airport, Oubaai, Breakwater Bay and Herold’s Bay

NOTICE is hereby given that the water supply will be interrupted on 23 JULY 2024 FROM 09H00 TO 16H30 for the purpose of doing alterations to the water mains.
Should circumstances prevent the work being carried out during the abovementioned period; the work will be done on 24 JULY 2024 FROM 09H00 TO 16H30

*****************************
KENNISGEWING VAN DIE ONDERBREKING VAN DIE GESUIWERDE WATER TOEVOER.

DIE VOLGENDE AREAS SAL GERAAK WORD:
Groeneweide Park, Gwaing, George Lughawe, Oubaai, Breakwater Bay en Heroldsbaai

KENNISGEWING geskied hiermee dat die water toevoer onderbreek sal word op 23 JULIE 2024 VANAF 09H00 TOT 16H30 met die doel om veranderings aan water hoofleidings te maak.
Sou omstandighede verhoed dat die werk gedoen kan word gedurende bogenoemde tydperk, sal die werk gedoen word op 24 JULIE 2024 VANAF 09H00 TOT 16H30

Unexpected Power Outage in Zones 7 and 8, Thembalethu

The power supply has been restored to Zones 7 and 8. “Gushindoda” will remain off until all illegal connections are removed.

***

An unplanned power outage has occurred in Zones 7 and 8 in Thembalethu due to illegal connections. Electricians have been dispatched and are currently repairing the damage. We appreciate your patience and understanding as we work to resolve this issue.

Urgent Notice for Public: Construction Work Notice – Garden Route Dam Suction Pipe Works

URGENT NOTICE FOR PUBLIC: CONSTRUCTION WORK NOTICE: GARDEN ROUTE DAM SUCTION PIPE WORKS

A planned construction of the Garden Route Dam Suction pipe works, initially scheduled for weekdays, will also include the following Saturdays between 07:00 and 14:00.

• Saturday, 20 July 2024
• Saturday 27 July 2024
• Saturday, 3 August 2024
• Saturday, 10 August 2024

SERVICE DISRUPTION:
Minor operational interruptions can be expected during the construction works. Advance notification of planned temporary disruptions and the effects thereof will be issued via social media.

TRAFFIC IMPACT:
No impact on traffic.

ACCESS TO SITE:
Access to the site will be strictly controlled. No member of the public will be allowed access to the construction area, in terms of the Occupational Health and Safety Act.
PROJECT ENQUIRIES: Mr Andre Scheepers – 044 801 9492 (Technical)
: Mr Alewijn Dippenaar – 082 457 5675 (Public Liaison Officer)

The George Municipality apologises for any inconvenience and appeals to the public to be patient and exercise caution throughout the construction period. Thank you for your understanding and cooperation.

Construction of a New Pacaltsdorp (East) Reservoir – Working Saturday

URGENT NOTICE: CONSTRUCTION OF A NEW PACALTSDORP (EAST) RESERVOIR- WORKING SATURDAY
A planned construction of the New Pacaltsdorp (East) reservoir, tower & pump station, initially scheduled to take place on weekdays, will also include tomorrow, Saturday, 20 July 2024 between 07:00 and 14:00.

SERVICE DISRUPTION:
Minor operational interruptions can be expected during the construction works. Advance notification of planned temporary disruptions and the effects thereof will be issued via social media.

TRAFFIC IMPACT:
Residents, road users and pedestrians need to exercise caution throughout the construction period. Please adhere to flag persons, temporary construction works and road signage.

ACCESS TO SITE:
Access to the site will be strictly controlled. No member of the public will be allowed access to the construction area, in terms of the Occupational Health and Safety Act.
PROJECT ENQUIRIES: Mr Andre Scheepers – 044 801 9492 (Technical) :Mr Alewijn Dippenaar – 082 457 5675 (Public Liaison Officer)

The George Municipality apologises for any inconvenience and appeals to the public to be patient and exercise caution throughout the construction period. Thank you for your understanding and cooperation.

Public Notice: A planned construction of the New Thembalethu (East) reservoir

A planned construction of the New Thembalethu (East) reservoir, tower & pump station, initially scheduled to take place on weekdays, will also include tomorrow, Saturday, 20 July 2024 between 07:00 and 14:00.

The work will also include Tuesday, 23 July 2024 early morning from 02h00 until 24 July 2024.

SERVICE DISRUPTION:
Minor operational interruptions can be expected during the construction works. Advance notification of planned temporary disruptions and the effects thereof will be issued via social media.

TRAFFIC IMPACT:
Residents, road users and pedestrians need to exercise caution throughout the construction period. Please adhere to flag persons, temporary construction works and road signage.

ACCESS TO SITE:
Access to the site will be strictly controlled. No member of the public will be allowed access to the construction area, in terms of the Occupational Health and Safety Act.

PROJECT ENQUIRIES: Andre Scheepers – 044 801 9492 (Technical)
Alewijn Dippenaar – 082 457 5675 (Public Liaison Officer)

The George Municipality apologises for any inconvenience and appeals to the public to be patient and exercise caution throughout the construction period. Thank you for your understanding and cooperation.

URGENT NOTICE: CONSTRUCTION OF A NEW PACALTSDORP WEST RESERVOIR- WORKING SATURDAY

A planned construction of the New Pacaltsdorp (West) 14,5ML Reservoir, & Pump station, initially scheduled to take place on weekdays, will also include tomorrow, Saturday, 20 July 2024 between 07:00 and 14:00.

SERVICE DISRUPTION:
Minor operational interruptions can be expected during the construction works. Advance notification of planned temporary disruptions and the effects thereof will be issued via social media.

TRAFFIC IMPACT:
Residents, road users and pedestrians need to exercise caution throughout the construction period. Please adhere to flag persons, temporary construction works and road signage.

ACCESS TO SITE:
Access to the site will be strictly controlled. No member of the public will be allowed access to the construction area, in terms of the Occupational Health and Safety Act.

PROJECT ENQUIRIES:

Mr Andre Scheepers – 044 801 9492 (Technical)
Mr Alewijn Dippenaar – 082 457 5675 (Public Liaison Officer)

The George Municipality apologises for any inconvenience and appeals to the public to be patient and exercise caution throughout the construction period. Thank you for your understanding and cooperation.