Planned Power Outage: Portion of Modderrivier Line US47, Tramonto Area

KENNISGEWING VAN DIE ONDERBREKING
VAN DIE ELEKTRIESE TOEVOER.DIE VOLGENDE AREAS SAL GERAAK WORD: GEDEELTE VAN MODDERRIVIER LYN US47, TRAMONTO AREA

KENNISGEWING geskied hiermee dat die elektriese toevoer onderbreek sal word op VRYDAG 29 SEPTEMBER 2023 VANAF 09H00 TOT 16H30 met die doel om veranderings aan elektriese hoofleidings te maak. Klante word gewaarsku om die installasie as lewendig te beskou vir die volle periode aangesien die toevoer enige tyd gedurende die periode aangeskakel mag word.
Sou omstandighede verhoed dat die werk gedoen kan word gedurende bogenoemde periode, sal die werk gedoen word op MAANDAG 02 OKTOBER 2023 VANAF 09H00 TOT 16H30
*****
NOTIFICATION OF THE INTERRUPTION
OF THE ELECTRICITY SUPPLY.

THE FOLLOWING AREAS WILL BE AFFECTED:
PORTION OF MODDERRIVIER LINE US47, TRAMONTO AREA

NOTICE is hereby given that the electricity supply will be interrupted on FRIDAY 29 SEPTEMBER 2023 FROM 09H00 TO 16H30 to do alterations to the electrical mains. Consumers are warned to treat the installation as being live for the full duration as the supply may be resumed at any time within the notified period.

Should circumstances prevent the work from being carried out during the abovementioned period; the work will be done on MONDAY 02 OCTOBER 2023 FROM 09H00 TO 16H30

Electrotechnical Telephone Lines Down.

Please note that our switchboard number at our Electrotechnical department is currently down due to water damage.

Our technicians are attending to the fault.
Please contact:
Complaints:
0673503295/
044 801 9202/
044 801 9258/
044 801 9111
email gmun@george.gov.za

Offline Emergency Numbers

Offline Emergency Numbers
Issued by George Municipality, 25 September 2023

We are currently experiencing issues with our after-hours/ emergency numbers. While we have our technician working on the fault, we would like to urge the public to please use the alternative contact numbers in case of emergency:
074 423 8635/
074 621 8737

Gwaing Landfill Closed On 26 September 2023

Gwaing Landfill Closed on
26 September 2023

Gwaing landfill will be closed tomorrow due to the weekend inclement weather until the access to the landfill improves.

The transfer station will be accessible for domestic waste.

Updates will be provided in the morning tomorrow.

We apologize for any inconvenience caused.

Eskom Load shedding schedule update: 25 September 2023 @14:21

 

Due to the widespread damage to electricity infrastructure caused by flooding in the Western and Eastern Cape coastal areas, loadshedding will be suspended with immediate effect.

In all other areas, stage 3 loadshedding will continue to be implemented today until 05:00 on Tuesday. Thereafter, loadshedding will be reduced to Stage 2 from 05:00 until 16:00, followed by Stage 3 from 16:00 until 05:00 on Wednesday. This pattern will be repeated daily until further notice.

No Loadshedding for George and Wilderness until further notice.

Uniondale will be affected as follows:

Monday 25/09/2023
13:00 – 15:30

Tuesday 26/09/2023
13:00 – 15:30
21:00 – 23:30

Wednesday 27/09/2023
21:00 – 23:30

Thursday 28/09/2023
05:00 – 07:30
21:00 – 23:30

Friday 29/09/2023
03:00 – 05:30
11:00 – 13:30

ROTATIONAL SWITCH ON AFTER LOADSHEDDING – reduce power to avoid network tripping

Consumers are reminded to PLEASE use electricity sparingly after power returns. Please do not switch high-usage equipment on immediately after Load shedding.

Consumers are urged to turn off high-usage equipment and where possible to not switch on appliances such as stoves and kettles for at least 30 minutes after load shedding is scheduled to return. This will reduce the risk of overload tripping on the network.

Reporting power outages
Please do not phone the after-hours number or the Electrotechnical Department to report that you have no power immediately after load shedding is scheduled to be lifted. Please be aware of the rotational switching on i.e. areas are switched on one by one and not all at the same time to avoid overloading the system. Please wait at least 30 minutes before reporting no power. The Electrotechnical Directorate will be aware of a possible substation trip that needs to be sorted out.

Receive Eskom loadshedding notifications by downloading the free EskomSePush app from Google Play Store at https://sepush.co.za/

Update on the low flow of water, Skuinsbank Street, Herold’s 25 September 2023 @12 :11

Update on the low flow of water, Skuinsbank Street, Herold’s Bay
Issued by George Municipality, 25 September 2023 @12 :11

Please note that our team is still busy attending to the fault.
A water truck is stationed at the higher end of Skuinsbank street.

Please use water sparingly so that the network pressure increases and water reaches high lying areas.

We apologise for the inconvenience

ESKOM LOADSHEDDING UPDATE, 25/09 @ 8:30

 

ESKOM LOADSHEDDING UPDATE, 25/09 @ 8:30

National Control has granted Stage 3 exemption to Bellville Control (8h00-14h00).

Field teams have been activated for repairs and recovery of sites.

George will be affected as follows:

Monday 25/09/2023
None further

Tuesday 26/09/2023
02:00 – 04:30
10:00 – 12:30
18:00 – 20:30

Uniondale will be affected as follows:

Monday 25/09/2023
13:00 – 15:30

Tuesday 26/09/2023
05:00 – 07:30
13:00 – 15:30
21:00 – 23:30

Issued George Mun